California keeps adjusting its ADU rules every year, and the 2025 legislative session was no exception. Governor Newsom signed four ADU bills: SB 543, AB 1154, SB 9 and AB 462. Most took effect on January 1, 2026. If you started planning a backyard unit a year or two ago, a few of the ground rules have moved in your favor.
This is a builder's summary, not legal advice. Every property is different, and the city or county that issues your permit has the final word on how these rules apply to your lot.
Smaller ADUs now skip impact fees
SB 543 clarifies how ADU size is measured and who pays what. ADU and junior ADU size limits now refer to interior livable space, so wall thickness and exterior features don't eat into your allowance.
The fee changes are the part most owners will feel:
- No development impact fees on ADUs of 750 square feet or less of interior livable space, or on junior ADUs of 500 square feet or less.
- No school impact fees on ADUs and junior ADUs of 500 square feet or less.
That makes the 750 square foot mark worth designing around. A one-bedroom unit that lands just under it can save real money compared with one that creeps over.
Permit review has to move on a clock
SB 543 also puts deadlines on the review process:
- The city has 15 business days to decide whether your application is complete, and it has to tell you what's missing if it isn't.
- Resubmittals also get a 15 business day review.
- Cities need a written appeal process for incompleteness findings and denials, with a final decision within 60 business days.
In practice, the biggest delays we see still come from incomplete plan sets and slow correction responses. A tighter clock helps most when your designer, engineer and builder answer corrections quickly.
More combinations of ADUs on one lot
SB 543 also allows more combinations of ADU types on a single-family lot. It includes a converted ADU and a detached ADU, and a converted ADU and junior ADU together with a detached ADU. If you have a garage worth converting and room in the yard, it's worth asking your designer what combination the lot can support.
Junior ADUs: owner-occupancy only applies in one case
Under AB 1154, the owner has to live on the property only when the junior ADU shares a bathroom with the main house. Give the junior ADU its own bathroom and that requirement drops away.
AB 1154 also bars rentals of less than 30 days for junior ADUs, and for certain ADUs. If you were planning short-term rentals, check the rules for your specific unit type before you design around that income.
Cities that don't follow state law lose their ADU rules
SB 9 (the 2025 bill, not the 2021 lot-split law with the same number) adds teeth for local compliance. If a city doesn't send its ADU ordinance to the state housing department within 60 days of adopting it, the ordinance is void. It's also void if the state finds it out of compliance and the city doesn't respond within 30 days. For homeowners, this means local rules that conflict with state ADU law are harder to keep on the books.
Fire areas: the ADU can be finished before the house
AB 462 took effect right away in October 2025. It lets a detached ADU get its certificate of occupancy before the main house is rebuilt, if all of these apply:
- A state of emergency was declared for the county on or after February 1, 2025.
- The main house was destroyed or substantially damaged.
- The ADU is permitted and has passed its inspections.
For families rebuilding after the Palisades and Eaton fires, this can mean moving back onto the property sooner, in a smaller unit, while the main house is still under construction. AB 462 also speeds up coastal development permits for ADUs, which matters in coastal-zone neighborhoods like Venice, Santa Monica and Malibu.
What this means if you're planning an ADU now
- Design to the fee thresholds. If the program fits, a unit at or under 750 square feet of interior livable space avoids impact fees.
- Give a junior ADU its own bath if you don't want the owner-occupancy requirement.
- Submit a complete package. The new review clocks reward a plan set that's ready the first time.
- Ask about combinations. A garage conversion plus a detached unit may now be possible where it wasn't before.
We've built detached ADUs, two-story ADUs over garages and garage conversions across Los Angeles. You can see examples in our Stansbury ADU in Sherman Oaks and Harding ADU in Venice projects.
Sources
- Best Best & Krieger: Governor Newsom Signs Four New Accessory Dwelling Unit Bills
- California HCD: ADU Handbook
Related reading
- Los Angeles ADU Permit Requirements
- What Drives ADU Cost in Los Angeles?
- Detached vs. Attached vs. Junior ADU
Questions
Do I have to pay impact fees on an ADU in California in 2026?
Under SB 543, effective January 1, 2026, development impact fees cannot be charged on ADUs of 750 square feet or less of interior livable space, or on junior ADUs of 500 square feet or less. Units of 500 square feet or less are also exempt from school impact fees.
Do I have to live on the property if I build a junior ADU?
Under AB 1154, owner-occupancy is required only when the junior ADU shares a bathroom with the main house. A junior ADU with its own bathroom does not carry that requirement.
Can I rent my ADU on Airbnb?
Junior ADUs cannot be rented for less than 30 days under AB 1154, and the same applies to certain ADUs. Check the rules for your unit type and city before planning short-term rental income.
Can I move into my ADU before my fire-damaged house is rebuilt?
Under AB 462, a detached ADU can receive a certificate of occupancy before the main house if a state of emergency was declared for the county on or after February 1, 2025, the main house was destroyed or substantially damaged, and the ADU is permitted and has passed inspections.
Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.