California's New Energy Code: What It Means for ADUs, Additions and Remodels

The 2025 California Energy Code applies to permits submitted from January 1, 2026. Here is what it changes for new ADUs, additions and remodels in Los Angeles.

By Corey Abrams, owner of Jencor Construction, Inc. Published November 14, 2026.

California updates its building energy code every three years. The latest version, the 2025 Energy Code (Title 24, Part 6), applies to building permit applications submitted on or after January 1, 2026. It covers new homes and ADUs, and it also covers additions and major alterations to existing homes.

If your project's permit application went in after New Year's, these rules shape your mechanical, water heating and electrical choices. Here's what we're seeing on real projects.

The big picture: heat pumps are the baseline

For single-family homes, the code's energy budgets are now built around heat pumps for both space heating and water heating. You can still design around other equipment using the performance path, but your energy consultant will be starting from a heat pump baseline. Gas makes compliance harder, not easier.

The code also raises the bar on HVAC efficiency and controls, including smart thermostats that can shift use to lower-cost rate periods. It also asks more of exterior walls and windows.

New ADUs (detached or connected by a breezeway)

A newly built ADU is treated much like a small new house:

  • Solar is required, sized by the unit's floor area. There's no solar requirement if the calculated system is under 1.8 kW. The required size can drop 25% if you add a battery.
  • Space heating must be a heat pump on the standard (prescriptive) path.
  • Water heating: the prescriptive option is a heat pump water heater. A unit of 500 square feet or less can use an electric water heater with point-of-use distribution. A unit with one bedroom or fewer can use a 120-volt heat pump water heater instead of a 240-volt model.
  • Battery-ready wiring is required, unless the ADU's electric service is 125 amps or less.
  • Indoor air quality and ventilation rules apply regardless of size.

On a tight backyard ADU, these choices affect the design early. They decide where the water heater lives, how big the electrical panel and service need to be, and what roof area is available for solar.

Attached ADUs, garage conversions and additions

Additions and conversions are treated differently from new detached units:

  • Solar is not required for additions or alterations.
  • New or replacement heating serving the addition must be a heat pump.
  • New water heaters have to meet the heat pump options. Additions of 500 square feet or less can use an electric point-of-use system.
  • Ventilation: additions of 1,000 square feet or less are exempt from some whole-house ventilation rules, but they still have to meet indoor air quality requirements.

Our recent primary suite addition in Reseda is a good example of the kind of project where these rules come into play. A new bedroom and bathroom tie into the existing house, and the heating, ventilation and water heating for the new space all have to be planned together.

Fire rebuilds have a temporary exception

Executive Order N-29-25 temporarily suspends the update for repairing or rebuilding homes substantially damaged in the 2025 Los Angeles fires. Those rebuilds must be solar-ready, but they don't have to meet the solar and battery requirements. If you're rebuilding in the Palisades, Altadena or Malibu, confirm with your designer which version of the code your permit falls under.

What to do if you're planning a project

  • Decide on equipment before the plans are drawn. A heat pump water heater needs space and airflow, so it shapes the floor plan.
  • Check your electrical service early. Heat pumps, induction cooking and EV charging can push an older 100-amp panel past its limit. Upgrading the service is easier to plan for than to discover mid-project.
  • Budget for the energy report. Title 24 compliance documents are part of the permit set, and changes to equipment later in design can mean redoing them.
  • Ask about rebates. Utility and state programs for heat pumps change often, so check what's available when you're ready to buy.

Sources

Related reading

Questions

When did California's 2025 Energy Code take effect?

It applies to building permit applications submitted on or after January 1, 2026.

Does a new ADU in California need solar panels?

A newly built detached ADU generally needs solar sized to its floor area, unless the calculated system is under 1.8 kW. Additions, attached ADUs created as additions, and conversions do not have the solar requirement.

Do I have to use a heat pump in a home addition?

Under the 2025 Energy Code, new or replacement space heating serving an addition must be a heat pump, and newly installed water heaters must meet the heat pump options, with an electric point-of-use exception for additions of 500 square feet or less.

Do fire rebuilds in Los Angeles have to meet the new energy code?

Executive Order N-29-25 temporarily suspends the update for rebuilding homes substantially damaged in the 2025 Los Angeles fires. Those projects must be solar-ready but are not required to meet the solar and battery requirements.

Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.

Tell Corey about your project

Call or send a short note about the property and what you want to build. Corey will call you back to set up a consultation.

Call Text Book a visit
Text Corey(310) 770-7707