Sherman Oaks is part of the City of Los Angeles, so a home addition there is reviewed by City Planning for zoning and by the Department of Building and Safety for the building permit. This article covers what to confirm before design begins.
Start with the zoning for your address
The City limits the total floor area of a single-family house based on the zone and the size of the lot. An addition has to fit within that limit, along with the required setbacks and height limits. Have your designer confirm the zone and the remaining floor area for your address before any layout is drawn.
Flat lot or hillside lot
Sherman Oaks has both. In the areas the City designates as Hillside Areas, different rules apply: the allowed floor area is calculated from the slope of the lot, and the City limits how much grading can be done. A hillside addition usually needs a survey and more engineering than a flat-lot addition. Our hillside building guide covers this in more detail.
Adding out or adding up
- Adding out uses yard area and is limited by setbacks and the floor area allowed on the lot.
- Adding up keeps the yard but changes the structure. The existing foundation and framing have to be evaluated to carry a second story, and the height limits apply.
Which one makes sense depends on the lot, the existing house and what you need the space for. See our second-story feasibility checklist.
Permits and plan check
An addition is structural work, so it goes through plan check. Plans, structural engineering and energy documents are submitted, corrections are answered, and the permit is issued once the clearances are complete. Inspections follow at each stage of construction.
Make it look like one house
An addition succeeds at the connection to the existing home: the foundation, floor levels, roof lines, exterior materials and interior finishes. Our goal is an addition that looks like it was always part of the house.
How long it takes
On our projects, an addition usually takes about 10 to 12 months from start to finish.
We have built in Sherman Oaks, including two ADUs. See our home additions service and our Sherman Oaks page, or contact us.
Sources
- Los Angeles Department of Building and Safety
- Los Angeles City Planning: Baseline Mansionization and Baseline Hillside Ordinance provisions
- LADBS Information Bulletin P/GI 2020-003: Express Permits (No Plan Check Required)
Related reading
- Remodel, Add On, or Build New: How to Decide
- Second-Story Addition Feasibility Checklist
- Building or Remodeling on a Los Angeles Hillside Lot
Questions
Who approves a home addition in Sherman Oaks?
The City of Los Angeles. City Planning handles zoning, and the Department of Building and Safety handles plan check, the building permit and inspections.
How big can my addition be?
The City limits the total floor area of a single-family house based on the zone and lot size, and uses slope-based limits in designated Hillside Areas. Confirm the remaining floor area for your address before design begins.
How long does a home addition take?
On Jencor projects, an addition usually takes about 10 to 12 months from start to finish.
Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.