Thousand Oaks has its own Planning Division and Building Division, so a home addition there is reviewed by the City, not by Los Angeles County or Ventura County. This article covers what to confirm before design begins.
Start with the Planning Division
The City asks applicants to contact a planner first to find out which applications a project needs. Applications are submitted online through the City's TO/24 portal. The Planning Division can be reached at (805) 449-2323.
Building plan review
The Building Division handles plan review, permits and inspections. Since September 2025 it accepts plans in digital form only, uploaded through the same TO/24 portal. The Building Division can be reached at (805) 449-2320.
Check for protected trees early
Thousand Oaks protects its oak trees, and this often affects where an addition can go.
- All oak species more than two inches in diameter are protected.
- The protected zone extends five feet beyond the outer edge of the canopy or 15 feet from the trunk, whichever is greater.
- Building or grading near the canopy requires an Oak Tree Permit.
Locate every oak on or near the lot on the survey before the footprint of the addition is set.
Check private restrictions
Some properties are subject to a homeowners association or recorded restrictions. Ask for the current governing documents and find out whether the association reviews exterior changes. Private approval is separate from City approval.
Adding out or adding up
- Adding out uses yard area and is limited by setbacks, lot coverage and any protected trees.
- Adding up keeps the yard but changes the structure. The existing foundation and framing have to be evaluated to carry a second story.
See our second-story feasibility checklist.
Make it look like one house
An addition succeeds at the connection to the existing home: the foundation, floor levels, roof lines, exterior materials and interior finishes. Our goal is an addition that looks like it was always part of the house.
How long it takes
On our projects, an addition usually takes about 10 to 12 months from start to finish.
Jencor serves Thousand Oaks and the Conejo Valley from Tarzana. See our home additions service and our Thousand Oaks page, or contact us.
Sources
- City of Thousand Oaks: Planning Division
- City of Thousand Oaks: Building Division
- City of Thousand Oaks: Trees
Related reading
- Planning a Home Addition in Westlake Village
- Remodel, Add On, or Build New: How to Decide
- Second-Story Addition Feasibility Checklist
Questions
Who approves a home addition in Thousand Oaks?
The City of Thousand Oaks. The Planning Division determines which applications are needed, and the Building Division handles plan review, permits and inspections. Both use the City's TO/24 online portal.
Do oak trees affect a home addition in Thousand Oaks?
Yes. All oak species more than two inches in diameter are protected, and building or grading within the protected zone around a tree requires an Oak Tree Permit.
How long does a home addition take?
On Jencor projects, an addition usually takes about 10 to 12 months from start to finish.
Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.