The tile is the part of a shower everyone sees, but how the shower is built underneath determines how well it holds up. This is how we build showers at Jencor.
The pan: hot mop
We waterproof our shower pans with hot mop: layers of hot-applied asphalt and felt that form one continuous pan beneath the tile.
It is a traditional method, and in my experience nothing has replaced it. We rely on methods with a track record of lasting 30 years or more, and hot mop has that record.
California also has earth movement to consider. Settling and seismic activity can affect any waterproofing membrane. In my opinion, a properly installed hot mop pan holds up the longest.
The walls: a full mortar bed
Over the waterproofing, we float the walls with a full mortar bed:
- Paper and metal lath
- A scratch coat of cement plaster
- A brown coat, built out flat and true
The result is a solid cement structure, and the tile is set on it with the appropriate thinset.
Other methods
Other approaches are common, including vinyl liners and cement or fiber-cement backer board. They are faster to install. We choose hot mop and a full mortar bed because we believe they give our clients the most durable shower.
Questions to ask your contractor
- How will the shower pan be waterproofed?
- Will the walls be a mortar bed or backer board?
- How long have you been building showers this way?
Planning a bathroom remodel? See our bathroom remodeling work or contact us.
Related reading
Questions
What is a hot mop shower pan?
A shower pan waterproofed with layers of hot-applied asphalt and felt, forming one continuous pan beneath the tile. It is a traditional method with a long track record.
Is a mortar bed better than cement board in a shower?
A full mortar bed (paper and lath, a scratch coat and a brown coat) creates a solid cement base for the tile. Jencor uses it instead of cement board or fiber-cement backer board.
Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.