Jencor Construction

Budgets & Costs

Why the Lowest Bid Often Costs More

When one bid is much lower than the others, it is worth understanding why before you sign.

By Corey Abrams, owner of Jencor Construction, Inc. Published November 16, 2026.

When homeowners compare bids, one is often noticeably lower than the rest. Before choosing it, it is worth asking what accounts for the difference. In our experience, a much lower price usually reflects something that has been left out.

Where the difference usually comes from

  • Missing scope. The estimate is short and general, and parts of the job are not on it. Those items appear later as change orders.
  • Planned change orders. Some contractors bid low with the expectation of making up the difference through changes once the project is underway.
  • No license or insurance. Some contractors do not carry a valid license or insurance, and some advertise insurance they do not have.
  • Low wages. Some low bids depend on workers who are underpaid or paid under the table.

What a complete estimate includes

At Jencor, we write our estimates to be as thorough as possible. A complete estimate generally covers:

  • Demolition and debris removal
  • Framing, plumbing, electrical and mechanical work
  • Waterproofing, drywall, tile and finish carpentry
  • The materials included, and what each allowance covers
  • Permits and inspections
  • Final cleanup

If an item appears in one bid and not in another, it has not been eliminated. It has been left for later.

How to compare bids

  1. Start with the most detailed bid and use it as a checklist for the others.
  2. Ask about every gap. For example: does this include waterproofing, permits and debris removal?
  3. Verify the license and insurance. See how to hire a contractor in Los Angeles.
  4. Review the allowances. If an allowance is lower than the cost of the materials you want, the difference will be added later.

We are often called in to complete projects that began with the lowest bid. A thorough estimate at the start protects both the homeowner and the project.

If you would like us to review your bids, contact us.

Related reading

Questions

Why is one contractor's bid so much lower than the others?

Usually because it leaves out part of the scope, expects to recover the difference through change orders, or avoids costs such as licensing, insurance and fair wages. Compare bids line by line to see what is missing.

What should a contractor's estimate include?

Demolition and debris removal, framing, plumbing, electrical and mechanical work, waterproofing, drywall, tile and finish carpentry, materials and allowances, permits and inspections, and final cleanup.

Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.

Tell Corey about your project

Call or send a short note about the property and what you want to build. Corey will call you back to set up a consultation.

Call Text Book a visit
Text Corey(310) 770-7707