Planning a Remodel Budget When Material Prices Keep Moving

Construction material prices were up about 11% year over year in September 2026. Here is how to plan a remodel budget that holds up when prices keep moving.

By Corey Abrams, owner of Jencor Construction, Inc. Published November 14, 2026.

If you've gotten a remodeling bid recently and thought it looked higher than what a friend paid a few years ago, you're not imagining it. Construction materials have gone up fast in 2026, and tariffs are a big part of the reason.

Here's what's driving prices, and how we help clients build a budget that doesn't fall apart halfway through the job.

What's happening with prices

  • Associated Builders and Contractors reported that construction input prices rose 2.2% in September 2026 alone, and were 11.2% higher than a year earlier. That's based on federal Producer Price Index data.
  • ABC pointed to tariffed materials such as iron, copper and other metal products as rising especially fast.
  • Tariffs on steel and aluminum went to 50% in June 2025, and tariffs on Canadian softwood lumber have climbed as well. Roughly a quarter of U.S. lumber comes from Canada.

In a remodel, those categories show up everywhere: framing lumber, steel beams and hardware, copper wire and plumbing, aluminum windows and doors, and the many fixtures and appliances that are imported.

What it means for your project

  • Bids expire faster. Many suppliers now hold quotes for days, not months, so a contractor's price may only be good for a short window.
  • Allowances matter more. If your contract has an allowance for tile, plumbing fixtures or appliances, make sure it reflects today's prices for what you actually want.
  • Long-lead items are a risk. Windows, custom doors, specialty tile and some appliances can take weeks or months to arrive, and the price can change before they do.

How to build a budget that holds up

  1. Make your selections early. The sooner you choose fixtures, tile, appliances and windows, the sooner we can price and order them. Picking finishes during construction is where budgets and schedules slip.
  2. Order long-lead items up front. Once the contract is signed, we can place orders for windows, doors and specialty items right away and store them until they're needed. This locks in the price and keeps the job moving.
  3. Carry a real contingency. Older Los Angeles homes hide surprises behind the walls. A contingency for unknown conditions keeps one bad discovery from derailing the whole project.
  4. Read the scope, not just the total. When you compare estimates, check what each one includes. A low number that leaves out demolition, permits or finish carpentry isn't actually lower.
  5. Phase it if you need to. If the full scope doesn't fit, do the work that's hardest to undo first: structure, plumbing, electrical and waterproofing. Save finishes that are easy to upgrade later.
  6. Spend where it lasts. Put money into layout, waterproofing, cabinets and good windows. Decorative items like light fixtures and hardware are easy to change down the road.

Where to save without regret

  • Keep plumbing where it is. Moving a toilet, sink or shower drain adds labor and cost. A kitchen or bath that keeps its wet walls in place often gets most of the look for less.
  • Mix custom and standard. Custom cabinetry on the main wall and semi-custom elsewhere can stretch a budget.
  • Choose tile wisely. A dramatic tile in the shower and a simple field tile on the floor can look high-end without the cost of covering every surface in the expensive tile.

Every Jencor project starts with a written estimate and a signed contract, and we walk you through the scope line by line before you commit. Get in touch if you're starting to plan.

Sources

Related reading

Questions

Why are remodeling costs going up in 2026?

Construction input prices were up 11.2% year over year in September 2026, according to Associated Builders and Contractors. Tariffs on steel, aluminum, copper-related products and Canadian lumber are a major driver.

How can I protect my remodel budget from price increases?

Make selections early, order long-lead items such as windows and specialty tile once the contract is signed, carry a contingency for hidden conditions, and compare estimates by scope rather than by total price.

Should I wait for prices to come down before remodeling?

No one can predict prices reliably. Many homeowners do better locking in a scope and ordering materials early than waiting, especially when the work addresses a real need such as failing plumbing, waterproofing or space.

Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.

Tell Corey about your project

Call or send a short note about the property and what you want to build. Corey will call you back to set up a consultation.

Call Text Book a visit
Text Corey(310) 770-7707