Pacific Palisades is part of the City of Los Angeles, so a rebuild there goes through the City's Department of Building and Safety and City Planning. The Mayor's emergency orders created faster paths for Palisades Fire properties. This article explains those paths and what a general contractor handles.
Where to go
The City runs the One-Stop Rebuilding Center at 1828 Sawtelle Boulevard, open Monday through Friday. In February 2026 the City also opened a Palisades Inspections and Permitting Support Center at 16925 Marquez Avenue, in the Palisades, for residents and contractors.
The two main rebuild paths
City Planning describes two paths for single-family rebuilds.
- Like-for-like (within 110 percent). The new house is in substantially the same location and does not exceed 110 percent of the footprint and height of the house that was lost. These projects are exempt from Coastal Act review and environmental review. Features of the old house that did not meet current zoning can generally be kept within the old footprint.
- Zoning-compliant rebuild in the Coastal Zone. A single-family house that is larger than 110 percent can still avoid coastal review if it meets all current zoning standards and replaces the same number of homes. It must also be set back at least 10 feet from a canyon bluff or 25 feet from a coastal bluff.
A project that fits neither path goes through the regular Planning and coastal review that applies to the property.
ADUs and basements
City Planning's guidance says an ADU can be built on a lot where the main house was destroyed or badly damaged, and it can be built with the house or before it. A basement can be added to a rebuild, including where there was none before. Projects that add more homes to a lot, other than an ADU, are not eligible for the faster paths.
Building for wildfire
The Palisades has been mapped as a Very High Fire Hazard Severity Zone since 1999. A new house there is built to California's wildfire construction standards, which cover roofing, vents, siding, windows and decks. The state's new Zone 0 rules for the first five feet around the house are also worth planning for at the design stage.
Many Palisades lots are on slopes. Foundations, retaining walls and drainage are often a large part of a hillside rebuild, and they are worth evaluating before the design is final.
What a general contractor handles
- Site walk and budget. We look at the lot, foundation, retaining walls, utilities and access, and give you a budget range based on your property.
- Insurance estimate. We provide the detailed, line-by-line estimate your adjuster needs. We do not negotiate your claim.
- Design and permits. We work with your architect, coordinate engineering and energy reports, and manage plan check corrections with the City.
- Construction. One team runs the job from foundation through final inspection.
- Final inspections. We schedule inspections and see the house through to its certificate of occupancy.
Jencor is a licensed general contractor (#968170) and takes on fire rebuilds in the Palisades and Malibu. See our fire rebuild service or contact us to walk your lot.
Sources
- Los Angeles City Planning: Frequently Asked Questions Related to Palisades Fire Rebuilds (January 30, 2026)
- Los Angeles City Planning: Palisades Rebuild and Recovery
- City of Los Angeles: Palisades Rebuild Permit Center Opens (February 2026)
Related reading
- Rebuilding After the LA Fires: Where Things Stand
- Building or Remodeling on a Los Angeles Hillside Lot
- Zone 0 Wildfire Rules
Questions
Who issues building permits for a Pacific Palisades rebuild?
The City of Los Angeles, through the Department of Building and Safety and City Planning. The City's One-Stop Rebuilding Center is at 1828 Sawtelle Boulevard.
What is the 110 percent rule for Palisades rebuilds?
Under the Mayor's emergency order, a house rebuilt in substantially the same location that does not exceed 110 percent of the original footprint and height is exempt from Coastal Act review and environmental review.
Can I rebuild larger than 110 percent in the Palisades?
In the Coastal Zone, a single-family rebuild that meets all current zoning standards and required bluff setbacks can still be exempt from coastal review. Other projects go through the regular Planning and coastal review.
Planning a project in Los Angeles? Send Corey a note or call (310) 770-7707. Rules and requirements depend on the specific property; confirm with the city or county before you build.